ABOUT US.

Wagga image2-2

BACKGROUND Information

MYTILINEOS is the Renewables & Storage Development Business Unit of MYTILINEOS and expert across the full range of solar power applications, ranging from stand-alone solar parks and storage applications to complex hybrid projects. The decades of experience of the MYTILINEOS group in the thermal power sector, also makes us an ideal partner for hybrid applications, which combine the advantages of renewable energy sources with conventional power generation. Within the domain of electrical infrastructure, we have significant experience and engineering capability essential for the successful integration of solar power to the grid. Further to the EPC activity, we are also experienced project developers. We have the experience and capacity to support solar PV and energy storage projects from inception, through the development and construction stages and for the complete lifetime of the project.

The Wagga Wagga South Solar Farm (WSSF) received development approval in late 2020. WSSF is being developed by MYTILINEOS, who are responsible for the Engineering, Procurement and Construction (EPC). A contractor will be engaged to undertake the construction of the solar farm on behalf of MYTILINEOS.

The Wagga South Solar Farm Project is the second of two stages, and is located on 55ha at Windmill Road, Bomen, approximatively 7km North-East of the Wagga Wagga CBD in New South Wales. These Stage 2 works add another 49,364 panels generating some 18.7 megawatts to the 30 megawatts delivered by Stage 1 in June 2021, all of which are connected to the grid at the TransGrid zone substation. The proposed WSSF will, once operational, have the capacity to generate approximately 48,430 megawatt hours of carbon free electricity annually. The 48,430 MWh generated annually can be used to power – 6600 households.

Click to access the login or register cheese