A MYTILINEOS SOLAR pROJECT.

Overview & SUmmary

The project includes the installation of an array of photovoltaic panels with a maximum capacity of 18.7MWAC and the infrastructure will occupy approximately 55ha of land. The farm will include a site sub-station comprising a transformer, switch gear and protection equipment. The farm will consist of solar PV panels, steel racking and piled supports, inverter stations, electrical cabling, telecommunications equipment, an Operations and Maintenance Building, site substation and perimeter security fencing. The solar panels will be similar to those used for domestic applications and will operate as a single axis tracking system (SAT) which follows the sun during the course of the day to ensure optimal energy generation. The farm will consist of linear strings of mounted panels organised into blocks. Each block will connect to an inverter station that will convert the direct current (DC) energy into grid compatible alternating current (AC) energy. The generated electricity will be exported into the network by an overhead 66 kV transmission line into TransGrid’s substation adjacent to the development site. Note, the connection at TransGrid’s substation does not entail infrastructure on any other third party’s landholding.

Project STATUS

Project TIMELINE

Project Location
Click to access the login or register cheese